Layout & Results

  1) Layout

 1. Straight Line : 100m 
 3. Straight Line : 100m, incline10
 5. Straight Line : 50m
 7. Straight Line : 50m
 9. Straight Line : 270m, incline10
 11. Straight Line : 100m, incline10
 13. Straight Line : 100m
 
 2. Curve : 30m
 4. Curve : 20m
 6. Curve : 30m
 8. Curve : 20m
 10. Curve : 100m
 12. Curve : 30m
  Total 1,000m


2) No. of Couplers : 4

   a. Coupler 1 : 260m mark
   b. Coupler 2 : 500m mark
   c. Coupler 3 : 750m mark
   d. Coupler 4 : 850m mark

   * Couplers are subject to be installed on the straight condition.


3) Results

  a. Successful cable inserting regardless of distance.
  b. 15% lower pressure will be used for fiber optic cable.
  c. Using pilling jacket is easier than using Air-presser.
  d. Little air ran out through the couplers but coupler has been modified for perfect air-sealing even       such air leakage did not influence on operation.



TEST REPORT (Cable Inserting)
  Date : OCT.28.2000
 1. Used Equipment  Super Jet (Made in Switzerland)
 Cable Jet, Plumettaz. S. A CH-1880 Bex.
 2. Compressors  Grimmer Schmidt Compressor -300H-
 3. Gas  Oxygen
 4. Cable :  a. Name : Fiber Optic Cable
 b. Spec : 72 core
 c. Diameter : ик19
 d. Length : 1km
 e. Weight : 120kg (120g/m)
 5. Duct Clearing :  a. Sponge : 15sec
 b. Lubricant : 25sec
 6. Cable Inserting  a. Length : 1km
 b. Time : 20 minutes
 c. Air-Pressure : Ave. 9Bar
                          beginning : 7~8Bar
                          after 500m : 9~10Bar



Jet Air Operation (Super Jet)



-Turn threaded nozzle into terminator until tight,  
  without pull line or missiles to blow any debris or
  water which might have collected


- Open gate on nozzle to apply air to innerduct.  
   Close gate after any debris or water has been
   blown out


- Unscrew nozzle and thread pull line through eyelet
   in nozzle and tie to line blowing missile.
   Place pull line reel on stand for feeding

- Place line-blowing missile into open innerduct and
   carefully open gate on nozzle

- Feed pull line off reel and keep slight tension to
   avoid rope packing in innerduct

-When using flat tape as pull line, use twisted blow
   line to blow in and retrieve flat tape